Elevated Storage Tank Repainting
/SSM assisted in coordinating proper removal, disposal, and repainting of the interior and exterior of the tank in the time requested to suit the Authority needs.
Read MoreSSM assisted in coordinating proper removal, disposal, and repainting of the interior and exterior of the tank in the time requested to suit the Authority needs.
Read MoreSSM provided a water system evaluation and feasibility study to address current water needs and provide recommendations to the District for improvements to the system and better service to the schools’ population.
Read MoreConcept Design for Probable Maximum Flood
Read MorePermitting, design, and construction management for a $3.6 million water treatment filtration facility.
Read MoreSSM provided engineering services from feasibility thru construction for this 1.0 MGD Membrane Filtration Water Treatment Plant
Read MoreSSM designed 7,000 feet of 16” diameter potable water transmission pipeline to transport water from the Western Berks Water Authority Water Treatment facility to the Bern Township Municipal Authority.
Read MoreCopyright © SSM Group, Inc. 2020. All Rights Reserved.