Rehabilitating  Community Roadways | Municipal Engineering

MARK STABOLEPSZY, PE | Director, Municipal Engineering and Planning

Perkiomen Township | Haldeman Road Rehabilitation

SSM provided civil engineering services for the rehabilitation design for 0.9 miles of a former state highway that was turned back to the Township. It included storm sewer and roadside drainage upgrades, select base repair, levelling course and bituminous overlay.

SSM performed field survey and prepared base plans, determined project scope and bid quantities, performed design, prepared project bid specifications and drawings, coordinated bid phase activities, and handled all construction phase activities, acting as the Township’s agent during the construction phase. We maintained coordination with PennDOT municipal service representatives. This project was completed in 2017. The construction cost was approximately $503,000.