Boiler Replacement Design
/SSM prepared construction documents for the installation of a dual fuel 1,200 HP boiler to replace a 67 year old water tube boiler.
Read MoreSSM prepared construction documents for the installation of a dual fuel 1,200 HP boiler to replace a 67 year old water tube boiler.
Read MoreSSM conducted a survey and performed an energy audit of the existing facility in 2010 and suggested several no cost and low cost strategies for saving energy as well as some capital improvement project that would have an impact on energy efficiency.
Read MoreStudy and preliminary design for the conversion of a 2,400 square foot lecture hall into three separate functional spaces by the installation of moveable partitions. HVAC and electrical systems needed to be reconfigured to function as three individual zones. SSM performed a survey of existing HVAC and electrical systems, determined how to modify these system to support the new architectural layout for the space, and estimated the cost of construction for the renovations. SSM also evaluated the existing structure to determine if it could support the proposed moveable partitions.
Assessed the existing condition of the timber-framed structure and provided structural engineering analysis and design to replace or reconstruct a portion of the Breaker.Assessed the existing condition of the timber-framed structure and provided structural engineering analysis and design to replace or reconstruct a portion of the Breaker.
Read MoreSSM utilized high definition laser scanning equipment and software to quickly and accurately capture the existing facade conditions of the church’s 150-foot bell tower.
Read MoreFlorence, New Jersey
When the Marcella L. Duffy School was established as Florence School No. 1 in the 1870s, the four-classroom building was the first public school in the community. Located in Florence, New Jersey, this project involved the development of 53 units of affordable, senior housing. The original 1870s school building required substantial on-site inspection during construction. A three-story wood framed addition extended the building.
The project emphasized the adaptive reuse and rehabilitation of the Duffy School into an apartment building featuring historic renovation / revitalization of the former school, completed in 1924, plus new amenities for today's lifestyle. The sustainable design features of this project satisfy the standards of New Jersey’s ENERGY Efficient Homes and USGBC LEED© for Homes programs.
This project involved the development of 48 units of affordable, senior housing. The project features the adaptive reuse and rehabilitation of the former Eagle Shirt Company factory (aka Union Pants Mfg. Co.) into 21 one-bedroom apartments, and the new construction of an addition for 27 one-bedroom aparments. The building required substantial repairs due to fire damage and foundation subsidence. The three-story wood framed addition nearly doubled the footprint of the original building.Five of the 48 units will provide supportive housing or veterans. The sustainable design features of this project satisfy the standards of New Jersey's ENERGY Efficient homes and USGBC LEED for Homes programs.
Adaptive reuse of former Social Center with new floor addition
Read More
Spotts, Stevens and McCoy has been engaged with the Owners of Midway Fitness since 2012, performing a building energy audit, expansion feasibility projects for their existing facility located in Rehoboth DE. After their decision to relocate, SSM was engaged to provide due diligence and concept planning for alternate sites with existing structures and ultimately, the greenfield site selected for development of a new facility, Gateway Motion and Fitness. Due diligence and concept planning included site and civil engineering, and multi-disciplinary building systems.
SSM is partnered with Ambit Architecture to provide professional services to develop new building design from Programming through Construction Documentation and has been further engaged as the Owner’s representative and Project Manager. The project is currently in Design Development Phase. Basis of Design calls for a 48,000 square foot multi-level facility with diverse programmatic needs for fitness, aquatics, physical therapy and administration.
SSM technical services include: structural design, mechanical, plumbing, fire protection and electrical design and Project Management services to coordinate the efforts of the architectural design work of Ambit Architecture, the engineering design teams and the pre-construction services of Wohlsen Construction.
SSM provided structural engineering and building engineering for four major buildings for First Quality Nonwovens, Inc. as the structural engineering member of the Design Build team for Quandel Construction services. These projects included a Major warehouse addition in McEhlattan, Pennsylvania, two manufacturing plants in Hazelton, Pennsylvania and a paper Mill in Lock Haven, Pennsylvania. The buildings included a 70,000 square foot manufacturing plant and a 200,000 square foot warehouse and a 70,000 square foot manufacturing and warehouse building.
SSM mechanical engineers completed a ventilation study to provide options to ventilate the “attic” spaceof Weightman Hall.
Read MoreSSM was retained by Quadrant EPP to evaluate the processes being used and recommend modifications to bring the facility into compliance.
Read MoreSSM conducted a comprehensive structural condition survey of this existing historic building.
Read MoreSSM provided engineering for upgrades to train station that was built in approximately 1870.
Read MoreMaster Plan, Phase I Restoration and Phase II Construction Documentation of the Lehigh Railroad Engine House for the White Haven Community Library
Read MoreOur services to NWNA have included providing ventilation studies at these three facilities to evaluate airflow, contaminant migration, and temperature control.
Read MoreSSM utilized high definition laser scanning equipment and software to quickly and accurately capture the existing structure and adjacent topographical conditions.
Read MoreSSM provided engineering services for a project that included conversion of an existing building to use as manufacture of sterile product used in the pharmaceutical industry, warehousing, and office space.
Read MorePerformed electrical design including new lighting design and parking improvements for the Reichhold Center for the Arts renovation.
Read More
Civil and landscape architecture concept design and existing facility condition studies focusing on placing the property (previously operated as a tannery) into private industrial/commercial use to achieve the highest and best use of the property.
Copyright © SSM Group, Inc. 2020. All Rights Reserved.