Membrane Filtration Water Treatment Plant
/Birdsboro Municipal Authority
Birdsboro, Pennsylvania
Engineering from feasibility thru construction - 1.0 MGD Water Treatment Plant
Feasibility and Conceptual Study. Study included analyzing current water consumption, projecting 20-year consumption rates, comparing treatment methods, and estimating construction costs for a future water treatment plant.
Pilot Study. Coordination and scheduling of a three-month, pilot study including procuring electrical contractors and fencing, oversight of the pilot unit operators and the water treatment plant operators to ensure required sampling was performed, and preparing the comprehensive pilot study report.
Plant Design. Services included management, budgeting, and design for the plant, obtaining PADEP permits, local planning approvals, building layout, design, and preparing a construction cost opinion.