Concept Design for Probable Maximum Flood
/Concept Design for Probable Maximum Flood
Read MoreConcept Design for Probable Maximum Flood
Read MoreSSM designed the WWTP upgrade for the Birdsboro Municipal Authority to meet the NPDES permit limits and be in compliance with the PADEP consent order.
Read MoreSSM provided engineering services from feasibility thru construction for this 1.0 MGD Membrane Filtration Water Treatment Plant
Read MoreSSM designed 7,000 feet of 16” diameter potable water transmission pipeline to transport water from the Western Berks Water Authority Water Treatment facility to the Bern Township Municipal Authority.
Read MoreRAWA is conducting ongoing verification of their new PS PSOC inventory, containing more than 400 sites. The above images displays a portion of these sites within their Zone A protection areas.
Read MoreWestern Berks Water Authority has an inventory of upstream dischargers that they plan to work with in the event of positive cryptosporidium test results.
Read More
SSM assists water systems, like Western Berks Water Authority, in the planning and execution of community and implementation events each year.
Read MoreAs part of an approved Source Water Protection Plan, SSM created a three-dimensional groundwater flow model to determine the direction and time-of-travel of groundwater entering the supply wells. Within one hour of receiving the information of the possible pipeline leak, SSM’s lead computer modeler was able to determine a predicted groundwater flow path that a contaminant would take upon entering the groundwater aquifer.
Read MoreCopyright © SSM Group, Inc. 2020. All Rights Reserved.