Scan to BIM: Domestic Water Tank Replacement
/Created Revit Model for internal Structural and MEP design.
Read MoreCreated Revit Model for internal Structural and MEP design.
Read MoreSSM designed the WWTP upgrade for the Birdsboro Municipal Authority to meet the NPDES permit limits and be in compliance with the PADEP consent order.
Read MorePermitting, design, and construction management for a $3.6 million water treatment filtration facility.
Read MoreSSM services included general consulting and operations assistance; design and construction management of sewage collection system, pumping station, and interceptor replacement projects.
Read MoreWastewater Collection and Treatment Services, Hydraulic Modeling, and I/I Remediation
Read MoreSSM has supported several teams to serve in a multi-disciplinary way to the Department of Architecture and Preservation (DAP) of the Pennsylvania Historical and Museum Commission (PHMC) since 1995.
Read MoreSSM has supported several teams to serve in a multi-disciplinary way to the Department of Architecture and Preservation (DAP) of the Pennsylvania Historical and Museum Commission (PHMC) since 1995.
Read MoreSSM has supported several teams to serve in a multi-disciplinary way to the Department of Architecture and Preservation (DAP) of the Pennsylvania Historical and Museum Commission (PHMC) since 1995.
Read MoreSSM provided engineering services for a project that included conversion of an existing building to use as manufacture of sterile product used in the pharmaceutical industry, warehousing, and office space.
Read MoreSSM has provided engineering services to Blue Ridge for many years covering a wide variety of services.
Read MoreAs part of an ongoing consolidation of space and expansion of research capacity SSM provided architectural engineering and construction management assistance to create a new research and laboratory section at the facility.
Read MoreSSM analyzed the chilled water system serving a 27,600 square foot manufacturing cleanroom in the Corporate Headquarters Facility.
Read MoreSSM is providing a full range of construction stakeout and surveying services to L.F. Driscoll for the $354 million construction of a 476,000 SF surgical tower expansion on the Reading Health System campus.
Read MoreSSM prepared a plan to improve pedestrian and vehicular circulation along Business Route 422 between 2nd and 3rd Avenues in West Reading, PA.
Read MoreAssisted with Construction Documents and Site Engineering.
Read MoreSSM electrical engineers performed the design review for the 2.8 kW ground mounted solar array connecting the system into the campus distribution system and design review for the electrical car charging station as in-kind gifts to the University.
Read MoreSSM provided engineering services from feasibility thru construction for this 1.0 MGD Membrane Filtration Water Treatment Plant
Read MoreSSM designed 7,000 feet of 16” diameter potable water transmission pipeline to transport water from the Western Berks Water Authority Water Treatment facility to the Bern Township Municipal Authority.
Read MoreSSM provided Master Planning for 4 public parks owned and maintained by Wyomissing Borough.
Read MoreSSM has provided the hospital with a wide variety of civil engineering, environmental, and facilities services since 1990. The largest hospital in Berks County PA, having its principal facility on a 36-acre urban campus in the Borough of West Reading, where it is surrounded by residential and other institutional uses. As is common for a large institutional facility, the Hospital is in a near-constant state of expansion and renovation.
Read MoreCopyright © SSM Group, Inc. 2020. All Rights Reserved.